
Full View
Sarnased esemed
Top Heavy Duty Pull Door Way Gym Chin Up Bar Doorway Exercise Fiess Workout (Premium Grade 62cm to 100cm)
238 müüdud
( 0 Arvustused )
€42.58€62.02
Värv : 62–100 cm
Kogus :
Aruanne
Kaasake autoriõiguste rikkumineTasuta standardne kohaletoimetamine. Vaadake üksikasju
Hinnanguliselt vahemikus Sat, Aug 30 kuni Fri, Sep 5
Toote saate tagastada 30 päeva jooksul alates kättesaamisest. Vaadake üksikasju
Ostke enesekindlalt
Raha tagasi garantii
Saate tellitud kauba või raha tagasi. Lisateavet
About this item
Seller assumes all responsibility for this listing.Eseme number: 18492132
Item specifics
Item description from the seller
Model: Door_Way_Gym_Bar
Top Grade Heavy Duty Pull Up Door Way Gym Chin Up Bar Doorway Exercise Fiess Workout
The Door Bar gives you a stable base for chin-ups and other exercises. it can help develop some serious forearm, biciep, back, shoulder, and tricep muscle. Don't forget these also can be used for abs.
Mount this door bar into any doorway up to 32" wide. You can mount it with included hardware, or pressure-mount it for light work such as sit-ups or crunches.
Heavy Duty Chrome Plated Steel Bar w/foam handles grips for comfort
Adjustable from 62cm-100cm
Support up to 100kg
Includes All Doorway mounting hardware & support brackets
Compatible with almost any door frame
Can be easily set up
Allows you to workout in the convenience of your own home
Lightweight for Easy Transportation
Foam pads provides secure and comfortable grip
Includes exercise instructions
Perfect for Indoor and Outdoor Use
Easy to Maintain and Keep Clean
Effectively perform pull-ups, chin-ups or crunches when moun
ted near the floor
Installation Method 1:
Step 1: Rotating horizontal bar 2 head (a head clockwise,1 head of inverse clock), turn to 2 end near the installation area 2 side, juz card master as the standard.
Step 2: Card good goods continue to rotate middle pole (sponge position) until 2 end can't elongation so far.
Step 3: every time before use check the installation is firm.
Installation Method 2:
Step 1: The plus fixed pad with the screws on both sides
Step 2: with the hight bar recess alignment mat.
Step 3: Set Good.




